989-772-8888 info@jrgollc.com

Distribution Structure Identification

Per DIMP requirements in an effort to assure pipeline integrity and further improve the safety of pipeline transportation of energy products, the identification and monitoring of distribution structures must be maintained.  Often times a carbon steel distribution system has been repaired over and over again with poly segments and lacking the documentation and/or improvements to the CP system never occurred.  JRGO will supply experienced technicians to perform testing to define discontinuities in the structure.  These structural findings should be documented and updated into system GIS database.  JRGO reports on system design, material characteristics, operating conditions, and system improvement recommendations to ensure compliance.

FOR MORE INFORMATION ON THIS SERVICE OR IF YOU WOULD LIKE TO REQUEST A BID, CONTACT US.

Email Us

Contact Us

2193 Northway Drive, Mt. Pleasant, MI 48858

info@jrgollc.com